HQS 620 Grand Canyon University Project Management Methodologies
HQS 620 Grand Canyon University Project Management Methodologies
HQS 620 Grand Canyon University Project Management Methodologies Essay Assignment
HQS-620: Project Management in Health Care Grand Canyon University
Course Description
This course examines the models and approaches of project management in health care settings. Learners demonstrate understanding of the project management process and its application to health care quality and safety initiatives. Learners gain skills to identify various stakeholders and roles, set goals and expectations, plan stakeholder engagement, and identify ways to mitigate obstacles in health care project management. Prerequisite: HQS-610.
Assessment Description
The goal of this assignment is to compare and contrast different project management methodologies that can be used in health care project management. Conduct your own research to compare and contrast the methodologies of Lean/Six Sigma, Waterfall, PSDA, and Agile. Choose another project management methodology of your choice.
To finish the assignment, use the HQS 620 Project Management Methodologies template.
This assignment necessitates the use of two to three scholarly resources.
While APA style is not required for the body of this assignment, solid academic writing is expected, and source documentation should be presented using APA formatting guidelines, which can be found in the Student Success Center’s APA Style Guide.
You are required to submit this HQS 620 Project Management Methodologies assignment to LopesWrite. A link to the LopesWrite technical support articles is located in Class Resources if you need assistance.
Attachments
Resources
Collapse All
9 of the Most Popular Project Management Methodologies Made Simple
Read “9 of the Most Popular Project Management Methodologies Made Simple,” by Aston, located on the Digital Project Manager website
Hybrid Project Management Has Role in Health Care Today
Read “Hybrid Project Management Has Role in Health Care Today,” by Hakim, from Physician Leadership Journal (2019).
https://lopes.idm.oclc.org/login?url=https://search.ebscohost.com/login.aspx?direct=true&db=edsgao&AN=edsgcl.579714743&site=eds-live&scope=site
HQS 620 Project Management Methodologies: Case Studies
Read “Project Management Methodologies” in Project Management: Case Studies.
https://lopes.idm.oclc.org/login?url=https://search.ebscohost.com/login.aspx?direct=true&db=cat01182a&AN=gcu.317842&site=eds-live&scope=site
How to Begin a Quality Improvement Project
Read “How to Begin a Quality Improvement Project,” by Silver et al., from American Society of Nephrology (2016).
https://cjasn.asnjournals.org/content/clinjasn/11/5/893.full.pdf
Project Management for the Advanced Practice Nurse
Read Chapters 1 and 2 in Project Management for the Advanced Practice Nurse.
View Resource
A Health Care Project Management Office’s Strategies for Continual Change and Continuous Improvement
Read “A Health Care Project Management Office’s Strategies for Continual Change and Continuous Improvement,” by Tremblay Aubry, R
… Read More
Top nursing paper writers on hand to assist you with assignment : HQS 620 Project Management Methodologies
https://lopes.idm.oclc.org/login?url=http://ovidsp.ovid.com.lopes.idm.oclc.org/ovidweb.cgi?T=JS&CSC=Y&NEWS=N&PAGE=fulltext&AN=00126450-201801000-00002&D=ovft&PDF=y
Top Project Management Methodologies 2019
View “Top Project Management Methodologies 2019,” from KnowledgeHut, located on YouTube.
Project Management for Healthcare
Read the “Safety” and “Regulatory” sections of Chapter 2 in “Project Management for Healthcare,” by Shirley (2011
… Read More
https://lopes.idm.oclc.or
HQS-620 Project Management Methodologies Template
Directions: Research information about the project management methodologies listed below to complete the table. In addition, conduct your own research on other project management methodologies and include this in the table below. The assignment requires a minimum of two or three scholarly resources. A resource may be used more than once in the last column of the template.
Project Management Methodology | Description | Pros | Cons | Example of when this methodology would be appropriate | Scholarly Resource |
Lean/Six Sigma | |||||
Waterfall | |||||
PDSA | |||||
Agile | |||||
Choose an additional project management methodology here |
HQS 620 Project Management Methodologies Rubric
Collapse All
Lean/Six Sigma
14.4 points
Criteria Description
Lean/Six Sigma
- 5: Excellent
14.4 points
The required elements for Lean/Six Sigma are present and thorough.
- 4: Good
13.25 points
The required elements for Lean/Six Sigma are present and detailed.
- 3: Satisfactory
12.67 points
The required elements for Lean/Six Sigma are present.
- 2: Less Than Satisfactory
11.52 points
The required elements for Lean/Six Sigma are present but lack details or are incomplete.
- 1: Unsatisfactory
0 points
The required elements for Lean/Six Sigma are not present.
Waterfall
14.4 points
Criteria Description
Waterfall
- 5: Excellent
14.4 points
The required elements for Waterfall are present and thorough.
- 4: Good
13.25 points
The required elements for Waterfall are present and detailed.
- 3: Satisfactory
12.67 points
The required elements for Waterfall are present.
- 2: Less Than Satisfactory
11.52 points
The required elements for Waterfall are present but lack details or are incomplete.
- 1: Unsatisfactory
0 points
The required elements for Waterfall are not present.
PDSA
14.4 points
Criteria Description
PDSA
- 5: Excellent
14.4 points
The required elements for PDSA are present and thorough.
- 4: Good
13.25 points
The required elements for PDSA are present and detailed.
- 3: Satisfactory
12.67 points
The required elements for PDSA are present.
- 2: Less Than Satisfactory
11.52 points
The required elements for PDSA are present but lack details or are incomplete.
- 1: Unsatisfactory
0 points
The required elements for PDSA are not present.
Agile
14.4 points
Criteria Description
Agile
- 5: Excellent
14.4 points
The required elements for Agile are present and thorough.
- 4: Good
13.25 points
The required elements for Agile are present and detailed.
- 3: Satisfactory
12.67 points
The required elements for Agile are present.
- 2: Less Than Satisfactory
11.52 points
The required elements for Agile are present but lack details or are incomplete.
- 1: Unsatisfactory
0 points
The required elements for Agile are not present.
Additional Project Management Methodology
14.4 points
Criteria Description
Additional Project Management Methodology
- 5: Excellent
14.4 points
The required elements for the selected methodology are present and thorough.
- 4: Good
13.25 points
The required elements for the selected methodology are present and detailed.
- 3: Satisfactory
12.67 points
The required elements for the selected methodology are present.
- 2: Less Than Satisfactory
11.52 points
The required elements for the selected methodology are present but lack details or are incomplete.
- 1: Unsatisfactory
0 points
The required elements for the selected methodology are not present.
Mechanics of Writing (includes spelling, punctuation, grammar, and language use)
4 points
Criteria Description
Mechanics of Writing (includes spelling, punctuation, grammar, and language use)
- 5: Excellent
4 points
The writer is clearly in command of standard, written, academic English.
- 4: Good
3.68 points
Prose is largely free of mechanical errors, although a few may be present. The writer uses a variety of effective sentence structures and figures of speech.
- 3: Satisfactory
3.52 points
Some mechanical errors or typos are present, but they are not overly distracting to the reader. Correct and varied sentence structure and audience-appropriate language are employed.
- 2: Less Than Satisfactory
3.2 points
Frequent and repetitive mechanical errors distract the reader. Inconsistencies in language choice (register) or word choice are present. Sentence structure is correct but not varied.
- 1: Unsatisfactory
0 points
Surface errors are pervasive enough that they impede communication of meaning. Inappropriate word choice or sentence construction is employed.
Documentation of Sources
4 points
Criteria Description
Documentation of Sources (citations, footnotes, references, bibliography, etc., as appropriate to assignment and style)
- 5: Excellent
4 points
Sources are completely and correctly documented, as appropriate to assignment and style, and format is free of error.
- 4: Good
3.68 points
Sources are documented, as appropriate to assignment and style, and format is mostly correct.
- 3: Satisfactory
3.52 points
Sources are documented, as appropriate to assignment and style, although some formatting errors may be present.
- 2: Less Than Satisfactory
3.2 points
Documentation of sources is inconsistent or incorrect, as appropriate to assignment and style, with numerous formatting errors.
- 1: Unsatisfactory
0 points
Sources are not documented.